This leading data centre is a £30m cutting edge facility and the most advanced centre of its type in the UK, the development was delivered by Laing O'Rourke's Crown House Technologies division. The project presented a number of technical challenges and our extensive specialist joinery and construction knowledge meant we were excellently placed to deliver exceptional results.

Services

  • Design

  • Manufacture

  • Installation

Our Work

This project is at the forefront of cutting-edge design with a towering 22m high drum formed around a 5.5m radius fundamental to project success. We created a high gloss finish for the drum, seamless in design and grated with a fire rated surface treatment using a vacuum formed radius laminated panel. Works were built digitally using a 3D model to finalise all interfacing and detailing before manufacture.
Our expert team created specialist distinctive walnut feature walls in the impressive boardroom, bespoke tea points with Corian worktops, IPS panelling to washrooms, ironmongery, skirtings, architraves and window boards.
All work was prefabricated where possible, reducing on-site labour requirements. Full works were undertaken within a challenging 12-week programme, leaving our client delighted with the end result.